During day one of working in the PGC hot shop, Jake continues to tweak his CAD designs while Jason begins work at the glassblower’s bench. New school and old school unite in a beautiful way.
The final shapes will be filled with several gallons of water and suspended from the ceiling, so Jake must test the design of his hanging system using an unfinished early prototype. The results are great!
We would like to give a huge thank you to the PGC for their support in the design and fabrication of the glass structures that will be used in this installation at the Mattress Factory running from May 15, 2015 through Winter 2016.
No comments:
Post a Comment